East Delevan Baptist Church
Delavan, WI
The East Delavan Ministry Activity Building was designed in 2007 and constructed during 2007-2008. This 7200 SF facility incorporates a large multi-purpose room for banquets, large worship events, and athletic activities such as basketball and volleyball. The building also accommodates two large classrooms, and a serving kitchen.
The building was designed to maximize space and economy while providing an appealing exterior appearance. The assembly area of the building was constructed with a pre-fabricated metal building. The classroom area was light frame construction with prefabricated wood trusses.
Phillips, Milewski & Associates provided architectural, site and structural design services for this project.
Lighthouse Baptist Church
Lisbon, WI
The 5,000 S.F. addition to Lighthouse Baptist Church in 2003 more than doubled the size of the church, which was very needed by the growing congregation. Many improvements were made, including the addition of a 3,300 S.F. auditorium. This space was the focus of the addition, allowing the existing auditorium to be converted into a fellowship hall and classroom space. Additionally, a new entrance vestibule and narthex improved circulation and provided upgrades to handicap accessibility.
Cornerstone Baptist Church
Waterloo, WI
Cornerstone Baptist Church was designed in 2003 and completed in 2004. This 6,200 S.F. church is the home to a growing congregation in south-central Wisconsin. The wood framed building includes a 3,300 S.F. auditorium able to seat over 200 comfortably, classrooms for small group bible studies or Sunday School classes, a private office for the Pastor, a nursery, a full kitchen, and restrooms.
In 2006, we designed a 2000 S.F. classroom addition and construction was completed in 2007. The addition was wood-framed construction to match the original construction.